Skip to main content

LOTOcontrol

Digitize & Streamline
Your Lockout/Tagout Procedures

Built as a secure cloud platform, LOTOcontrol centralizes all LOTO operations with project-specific customization, real-time updates, and audit-ready traceability.
Empowering maintenance, operations, and safety teams, it ensures consistency, accountability, and full visibility across every site.

Lockout tagout software dashboard

How LOTOcontrol Works | Digital LOTO Workflow Explained

Step 1 / 6

Beyond the 6 Steps

Built for More Than Isolation

Two technicians in hard hats and coveralls at a switchgear lineup, one holding lockout tags, one holding a tablet

Energization Workflow

A dedicated 9-step, EPC-standard process for safely bringing systems back online after commissioning.

LOTOcontrol scheduling screen: a Gantt-style calendar with equipment tags, start and end dates, duration, and colored status bars

Scheduling

Plan isolations and energizations on a calendar. Coordinate crews before anyone’s on site.

Hardware & Field ID

Physical Security, Digitally Verified

LOTOcontrol works with the padlocks you already use. Traditional mechanical padlocks, smart Bluetooth padlocks (ours or a third-party's), or a hybrid of both across the same site, the choice is yours.

Optional add-on

Smart Connected Padlock (LC-BT100)

LC-BT100 smart padlock diagram labeling the Light Indicator, USB-C Charging Port, Waterproof Plug, and Wake-up Button
  • Bluetooth 5.0+, AES-128 encrypted
  • Unlocks in under 2 seconds, only through the app, only for the authorized user
  • USB-C rechargeable, with a wake-up button and light indicator for at-a-glance status
  • IP66-rated, 20,000+ cycle tested
QR-enabled controlled field digital execution: a LOTO tag, a padlock sticker, and an equipment tag, each linking to a live digital record

One printer produces everything you need to identify equipment, padlocks, and isolation points on site.

1
LOTO Tag

Auto-filled straight from the approved isolation request

2
Padlock Sticker

Links that specific padlock to its digital record

3
Equipment Tag

Links any piece of equipment to its live record

Scan any of the three, land straight on the live digital record.

The provided printer handles labels up to 130mm, that covers the LOTO tag, padlock sticker, and a compact equipment tag comfortably. For a larger equipment sign, generate the design in LOTOcontrol, then print it on your own printer and laminate for field durability, or send it to a sign shop for a more permanent acrylic version.

Global Safety Standards

Compliance

Our default isolation workflow is designed to align with these internationally recognised standards, refined by our own field experience of common industry practice.

OSHA 1910.147

Lockout/Tagout regulation for hazardous energy

IEC 60204 / 60947

Electrical equipment and control safety

ISO 45001

Occupational health and safety management

These globally recognised standards ensure safety, traceability, and consistency across all industries.

Already running your own LOTO procedure? Share it with us and we’ll configure the workflow to match, so your teams keep working the way they already do.

Contact Us

Control Your Operations Anywhere

From the office, to the field, to the room where decisions get made, LOTOcontrol moves with you.

Hands on a laptop keyboard with the live isolation diagram open on screen

Act From the Field

Approve requests, receive alerts, and monitor isolation status from your phone, wherever you are. Decisions don't wait for you to get back to a desk.

A team in a coordination meeting looking at the live isolation diagram on a large screen

Oversee From the Office

Real-time dashboards at the organization level, tracking every site and project at once, or drill into one project for detailed status. Built for planning and oversight.

A hand holding a phone showing the LOTOcontrol app dashboard

Align the Team, Live

Pull up the live schematic on any screen, in a coordination meeting or on the plant floor, everyone sees the same real-time isolation status at once.

Deployment & Security

Your Infrastructure, Your Rules

Tap a card for the full spec and LOTOcontrol-related services.

Your cloud or ours. Let’s find the right deployment for you.

Let’s Talk

Have questions or want to see how LOTOcontrol fits into your project?

Whether you’re in commissioning, safety, or operations, we’re happy to help.

Discuss Your Project with LOTOcontrol

Form submitted

We’ll get back to you within 1 business day